Sunday, 19 July 2015

A look back on the last 2 days

We are sorry for the lack of updates, but both, our internet connection and time are limited. The first actual day of the competition is almost finished by now and we are very happy about how things are going.
For the setup days we've stayed at the venue except for the times we grabbed something to eat. During those days, we had a test match against Nao-Devils Dortmund and assisted them scoring an own goal with a bicycle kick. As far as we know this has never happened before and we'll probably post a video from that scene within the upcoming days.

One time, when we went out and ate at a Chinese fast food place across the street, the whole restaurant staff was watching us eat and some other customers took photos. In addition, it's always fun to see a team member bite on something spicier than he is used to.
The conference hall get's closed somewhere between 10 and 11 pm, so we had some time for Chinese beer, which is lighter on alcohol and milder on taste than German beer. Despite closing the day out this way we still manage to get up in time to grab breakfast before heading out. The longest part of that short walk often is the elevator ride from the 36th floor, which can take up to 5 or 10 minutes.




No comments:

Post a Comment